19 Jun A massive failure in the electrical system in Argentina and Uruguay
A recent massive failure in the electrical interconnection system on Sunday left all of Argentina and Uruguay without power, according to a major Argentine electricity provider.
The power cut occurred shortly after 07:00, leaving the countries without electric light for hours. And up to now some areas have not got it solved. And it is expected to have irregular power supply later on.
What do such situations mean for livestock farming?
The solution must be fast, appropriate ventilation and temperature must be provided immediately.
For 20 years, we have been specialising in solutions to provide reliable ventilation and temperature control via air inlets to avoid huge losses and expensive measures in order to save farmers´ business.
How long does it take to solve the problem in an electrical line?
OSMO systems work for up to 24 hours without electricity, animals are safe despite circumstances and there is enough time.
How much fuel does a generator consume to provide appropriate ventilation?
OSMO systems do not need generator´s fuel, our lifting motors have built-in batteries, which make any emergency free of charge.
Take a look at the most popular lifting systems
We are already helping thousands of farms to save animals and costs.
Consider it in your projects too, it is worthwhile.
Your customers will be grateful.
Feel free to contact us anytime.